Chamber Connections BLOG
Chamber Connections BLOG
INITIAL SILVER CREEK BRIDGE DETOUR STARTS MARCH 2 What’s Happening? The Rhode Island Department of Transportation will be reconstructing the Silver Creek Bridge on Hope Street in Bristol. Southbound traffic, into downtown Bristol, will be in place during all construction. Northbound traffic will be detoured. Pedestrian and bike traffic will be allowed throughout construction. RIPTA will be posting updated schedules to accommodate the detour route. When is it Happening? The SB “one way” travel over the bridge and NB detour will be in place from March 2 to mid-June. Two-way traffic will be in place from mid-June through the 4th of July Parade. The SB “one-way” and NB detour will return on July 6 and continue until the estimated end of construction, prior to Labor Day. RIDOT Business Outreach David Walsh | 401-479-4506
2 Comments
Rick Carter
3/31/2020 06:00:58 pm
What is the instructions on crossing the bridge both ways by bicycle or walking? Thank you for any help you can provide.
Reply
Suzanne
3/31/2020 09:54:52 pm
Hi Rick,
Reply
Leave a Reply. |
Archives
July 2024
Categories
All
|